Creating a Revision

To create a revision for a previously submitted application:

  1. Access the Original Application:
    • Open the job with AIA style billing.
    • Find the application you need to revise.
  1. Revision Application Number:
    • Type a revision number or letters in the field beside the Application No field (e.g., “3-R1”, “3-R2”).
    • For reference, the base number should stay the same as the original.
  1. Make Corrections:
    • Edit the values in the Continuation Sheet form as needed.
    • The revision shows the corrected amounts.
    • Save and finalize the revision.
  1. AR and GL Impact:
    • A new AR invoice is created for the difference.
    • If the revision reduces the amount, a credit is issued.
    • GL entries are adjusted accordingly.